Conventional Plug
Eneroil Conventional Top and Bottom Cementing Plug significantly reduce the drill out time, thereby resulting in cost saving. The Bottom Plug separates the cement from drill mud and features a rubber diaphragm which is opened once the plug has landed and latched into the Conventional Float Collar.
The top plug is used as a follow-up plug to displace cement, latches into the upper end of the bottom plug after latching these provide an anti-rotational feature to eliminate rotation during drilling and save drill out time.